Frequently Asked Questions
If the project includes a dam as defined in Paragraph 2.0(a)27 of ERP Applicant’s Handbook Volume I (Effective Date June 28, 2024) and meets the dam thresholds specified in Subsection 2.8 of ERP Applicant’s Handbook Volume II (Effective Date June 28, 2024), the applicant is to review Subsection 8.4.5 of ERP Applicant’s Handbook Volume I (Effective Date June 28, 2024) and provide all additional information as detailed under Appendix L of the same Volume (Effective Date June 28, 2024). This information also includes the submittal of Form 62-330.301(25), “Dam System Information”.
For dams that have been given a downstream hazard potential of Significant or High Hazard, the applicant must provide an emergency action plan (EAP). An EAP Template is available on the Florida Department of Environmental Protection’s website at https://floridadep.gov/water/engineering-hydrology-geology/documents/emergency-action-plan-florida-dams.
For projects with existing dams that have been given a downstream hazard potential of Significant or High Hazard, the applicant must provide a completed Form 62-330.311(4), “Condition Assessment Report for Florida Dams.”